Jobs in India
Search Jobs
Advertisements

Nlc Jobs for Walkin For Industrial Trainee in Chennai

NLC
Advertisements
Job Description
Post Name : Industrial Trainee (Finance)
No Of Vacancy : 32 Posts
Pay Scale : Rs. 10000/- (Per Month)
Educational Qualification : Pass in Intermediate Examination of Institute of Chartered Accountants of India (ICAI) (or) Institute of Cost Accountants of India (ICAI).
Nationality : Indian
Age Limit : 28 years (as on 01.06.2016)
Age Relaxation :
For SC/ST Candidates : 05 years
For OBC Candidates : 03 years
For PWD Candidates : 10 years
Job Location : Chennai (Tamil Nadu)
Selection Process : Selection will be based on performance in the Personal Interview.
How to Apply NLC vacancy : Interested Candidates may appear for interview in prescribed application form along with all the original certificates including community certificate, a set of Photostat copy of all the certificates at the time of Interview.
Advertising
Candidate Profile
Pass in Intermediate Examination of Institute of Chartered Accountants of India (ICAI) (or) Institute of Cost Accountants of India (ICAI).
Looking for CA , ICWA graduates profile.
2017-05-23 to 2017-06-23
Resume Samples
Company Profile
About Nlc
Walkin For Industrial Trainee Jobs in Nlc
Neyveli Lignite Corporation Limited, a Navratna Government of India Enterprise, under the administrative control of MOC has a chequered history of achievements since its inception in 1956.

A pioneer among the public sector undertakings in energy sector, NLC operates

Three Opencast Lignite Mines of total capacity of 28.5 Million Tonnes per Annum at Neyveli and one open cast lignite Mine of capacity 2.1 Million Tonnes per Annum at Barsingsar, Rajasthan.

Five pithead Thermal Power Stations with an aggregate capacity of 3240 MW. Further, NLC has also so far installed nine Wind Turbine Generators of 1.50 MW each, aggregating to 13.50 MW, thereby increasing the overall power generating capacity to 3253.50 MW.

NLC has forayed into renewable energy sector with inauguration of a 10 MW Solar Photo Voltaic power plant in Neyveli, thereby increasing the overall power generating capacity to 3263.50 MW.

A coal based thermal power project at Tuticorin, Tamil Nadu consists two units of 500 MW capacity each is being implemented through NLC Tamil Nadu Power Limited (NTPL), a joint venture between NLC and TANGEDCO (equity participation in the ratio of 89:11). Unit-I attained Commercial Operation Declaration on 18th June 2015. Unit-II, attained Commercial Operation Declaration on 29th August 2015

All the Mines of NLC are ISO Certified for Quality Management System, Environmental Management System and Occupational Health & Safety Management System. All the Power stations of NLC are also ISO Certified for Quality Management System and Environmental Management System. NLCs growth is sustained and its contribution to Indias social and economic development is significant.
Want latest jobs alert?
More Information
Location Chennai , Tamil Nadu
Education CA , ICWA
Experience 0 (yrs)
Industry Government Jobs
Job Type : Full-time
Free Resume Samples for Freshers
This job has been expired and not accepting application.
Post Resume Free
Advertisements
Specialist Officer, Apply Here Now
Across India
1399 Non Teaching Positions, Download Application Form
Across India
Faculty, Assistant Professor On 158 Posts
Delhi
Junior Technician , Fireman, Supervisor & 96 More Posts
Hyderabad
12000+ Si And Constables, Apply Here
Gujarat
146 Specialist Officers
Delhi
Group A, B And C Posts, Apply On Cbse.gov.in
Across India
10th, 12th Pass Data Entry Operators
Across India
Technician On 9144 Posts - Download Form Here
Across India
447 Alm, Tgt, Deputy Ranger, Warder Male, Warder Female 2024
Haryana
Contact Us Terms of Services Privacy Policy Government Jobs Sarkari Naukri Rojgar Samachar Nausena Bharti


Partner Sites : Jobs in USA - Jobs in Singapore - Empregos no Brasil

Follow us on : Find us on Facebook

2024 YuvaJobs.com - All Rights Reserved
Post Your Resume Here